E-Commerce Picking
Storage capacities, pricing, integrations, support, support, etc.
Ecommerce Integration
Shopify
Woocomerce
Magento
Prestashop
Open Cart
API
WMS propio implantado en Shipeu

(1) 3PLs that rely on technology facilitate the connection of your online store with their system. This establishes a two-way flow of information. In this way, you can check inventory levels in real time. You also have access to reliable, accurate and transparent data.

(2) Category A warehouses are spaces that facilitate efficient supply chain operations for any company. Category A warehouses minimize the total cost of ownership (TOC) for development.

A Grade A park would have a building aspect ratio of 1:1.5-1:3 with a minimum eave height of 70 feet (11 m). The number of piers in such a park is 1 per 10,000 square feet or less of plinth area.

*The warehouse floor is FM2 with a minimum floor load (UDL) of 5 tons per square meter.

A pad of at least 25.5 meters in length in a Grade A concrete parking area must support at least 40-foot trailers, and all internal lanes must allow unrestricted movement of trailers. Depending on the size of the warehouse, there should be 2 to 4 total lanes.

*To ensure efficient operation, amenities such as fire systems, CCTV surveillance, building insulation, LED lighting, security systems and other critical aspects must be designed well in advance. An effective Grade A park must have an adequate number of entrance/exit gates and parking spaces based on a thorough assessment of park traffic, as even one minute of delay can have a direct commercial impact.